calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Bridge Junglinster

Junglinster, Luxembourg

North-east of the city of Luxembourg, the consortium consisting of the Félix Giorgetty - BAM Galére - Victor Buyck companies built a steel composite bridge that is 444 m long and 17.60 m wide as part of the E29. The formwork solution from Doka made it possible to complete the bidge within the tight schedule specified and in the required fair- faced concrete quality.

Challenges:

• high fair-faced concrete quality
• tight construction schedule necessitated a weekly cycle
• safe working conditions for the entire site crew

Solutions:

The harmonised formwork solution consisting of ParaTop and Composite forming carriage ensures orderly progress.

Project data

Year of completion
2015
Country
Luxembourg
Realization
ARGE aus den Firmen Félix Giorgetti - BAM Galère - Victor Buyck, Luxemburg
Structure
Bridge