calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Viaduc de la Roumer

Langeais, France

In the heart of a forest massif, the 249 metres long Viaduc de la Roumer is built. The concrete shape and the level of molding is similar to the existing bridge. It is the first infrastructure Pilot Project in BIM for Clash Detection and Site Management. The Doka BIM solution included full formwork design in AutoCAD 2D, 3D BIM Model in IFC file format and data exchange with the client on BIM360, our Common Data Environment . In addition, Doka provided Renderings, Video Animations and smart realtime Renderings with Enscape.

Please also feel free to walk around in our Digital Twin of this Construction Site by opening the following Link with Google Chrome or Mozilla Firefox: https://api2.enscape3d.com/v1/view/ce10f593-fed8-416b-bf0e-f82fb72c1d17


Back to overviewDownload: Press Release

Project data

Project:
Viaduc de la Roumer
Location:
Langeais, France
Type of structure:
Bridge
Highes Pier:
20 m
Contracting company
NGE GC
Construction work by:
Vinci
Architect:
ARCADIS
Formwork planning:
Doka Nantes, Doka Paris, Doka Competence Center VDC/BIM (HQ Amstetten)
Start of construction:
April 2018
Completion:
January 2020