calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Hloubené tunely Troja

Czech Republic

The 'Hloubené tunely Troja' tunnel project is part of a by-pass around Prague. This 6380m long stretch of road is being built to relieve traffic congestion in the centre of Prague. The two tunnel tubes were built one after the other. The Large-area Top 50 formwork elements were pre-assembled and supplied ready to use.

Back

Project data

Year of completion
2010
Project duration
9 Months
Country
Czech Republic
Town or city
Prague
Realization
Terracon a.s.
Structure
Tunnel
Type of structure
Cut-and-cover tunnel

Floor-slab

Construction method
Partially monolithic
Cross-sectional shape
Curved/round
Clear width
14.30 m
Clear height
9.35 m
Formed length of tunnel
277 m
Length of concreting section
12 m
Number of casting sections
24