calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

New Orbital Highway and Truck Route - Package 2

Qatar

Challenge:
Detailed Design of Formwork and Shoring including indication of Cordinates for position of support legs and level of each U head Jack in 3D, Supply of all Formwork and Shoring for 8 Box type Viaducts and Precast Beam Support for 3 Junctions, Underpass structure with Passage to be able to shift on rollers as well as all Formwork Instructor involvement in actual training of site staff.

Solution:
SL-1 Superstructure with passage with hydraulic jacks for lowering into rollers. Design of special Adjustable Connecting Plate moving in 2 Directions to suit constant geometry changes.

Futher information
Back

Project data

Year of completion
2018
Project duration
24 months
Country
Qatar
City
Doha
Contractors
QDVC

Building data

Structure height
18m
Overall length of bridge
383m + 390m for Junction 3 structure
Longest span
13,7

Systems used

Top 50
Staxo 100
D3

Services used

Training