calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Zvornik Hydropower Plant – construction of Annex 5 to the dam

Serbia

The hydropower plant in Mali Zvornik, being the oldest hydropower plant on the river Drina, is currently in a process of rehabilitation. This investment of EUR 95 million will provide for increased power of Zvornik Hydropower Plant for 25%. In addition, it will increase the average annual production from 477 to 571 kWh.

Back

Project data

Year of completion
2013
Project duration
6 Months
Country
Serbia
Address
Mali Zvornik
Postcode
15318
Town or city
Mali Zvornik
Realization
Deneza M Inzenjering
Structure
Hydroelectric power station
Type of structure
Industrial structures