calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

C.Steinweg Warehouse

Malaysia

C. Steinweg, a well-known logitistic company is strategically located at Pasir Gudang, Johor. It offers warehousing services of a vareity of commodities. Doka supplied the formwork load-bearing tower Staxo 40 with top construction in the tables and loose form. It is efficiently overcome the challenge of difficulty in moving the tables due to thick beam.

Challenge:
The main beam thickness is 1.4m with secondary beam thickness is 1.0m. Difficulty in moving the tables.

Solution:
Proposed using Staxo 40 for the entire project with top construction in the tables and loose form. Tables were used at beams and loose form under the slab.

Back

Project data

Year of completion
2018
Project duration
September 2017 - February 2018
Country
Malaysia
City
Pasir Gudang

Building data

Structure height
17,59 m
Concreting steps height
8
Cycle time
20 days