calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Búrdalo Dam

Spain

The Búrdalo Dam, with a concrete volume of 163,000 m³, will regulate the flow of the Río Búrdalo. As well as the heavy-duty, extra-safe dam formwork units from Doka, the JV is also using Doka framed formwork and load-bearing tower systems, and a special metal formwork, for the 774 m crest width of the dam.

Back

Project data

Year of completion
2013
Project duration
36 Months
Country
Spain
Address
Búrdalo Dam, Cáceres
Postcode
10132
Town or city
Cáceres
Realization
JV Búrdalo (OHL, Sogeosa)
Structure
Hydroelectric power station
Type of structure
Industrial structures

Massive concrete dam

Construction method
Inclined
Structure height
31 m
Height of casting sections
2 m
Number of casting sections
18
Cycle time
7 -day cycle