calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Berg Isel Ski-Jump

Austria

With its 7 m cantilever and double inclination of 23° and 26°, the concrete slab presented some special challenges to the contractors. It was supported on approx. 30 m tall Doka load-bearing towersStaxo load-bearing towers with 42 frame legs.

Back

Project data

Year of completion
2002
Project duration
13 Months
Country
Austria
Address
Innsbruck
Realization
JV of Alpine-Mayreder & Ast-Holzmann
Structure
Sports/leisure facilities and public function halls
Type of structure
Fair-faced concrete
Architect
Zaha Hadid

Shaft / core

Construction method
Fair-faced concrete
Structure height
49 m
Number of casting sections
11