calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

New admin./control building, Leibis

Germany

Administration & control building for managing Germany's 2nd tallest reservoir dam. Contract specification for the FFC facade: outer shell of the 3-layer exterior walls cast in RC concrete, as fair-faced concrete of Category FFC 3 (as per Code of Practice for Fair-Faced Concrete, Aug. 2004) on the longside facade
Concrete: C25/ 30
Wall thickness: 20 cm

Back

Project data

Year of completion
2007
Project duration
4 Months
Country
Germany
Town or city
Unterweissenbach
Realization
Hermanns HTI-Bau GmbH&Co.KG
Structure
Office/administration/multipurpose building
Type of structure
Fair-faced concrete

Wall

Construction method
Straight
Number of storeys
4
Structure height
17 m
Height of casting sections
3.25 m