calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Nibelungen Bridge, Regensburg

Germany

Two composite forming carriages were fielded for casting the 30 m wide and 208 m long deck slab of the new Nibelungen Bridge in Regensburg, Bavaria. Due to the cantilevering steel brackets, the formwork- and platform unit was designed so that it could be swung out hydraulically to be repositioned, at the push of a button.

Back

Project data

Year of completion
2004
Project duration
6 Months
Country
Germany
Town or city
Regensburg
Realization
Max Bögl GmbH, Neumarkt
Structure
Bridge
Type of structure
Composite construction

Bridge deck/superstructure

Length of bridge (superstructure)
206.90 m
Width of bridge (superstructure)
30 m
Height of bridge (up to top edge of superstructure)
6 m
Cross-sectional shape of structural steelwork
Trough with bracing
Length of concreting section
24 m
Number of casting sections
10
Cycle time
7 -day cycle