calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK

Scherkondetal Bridge

Germany

The Scherkondetal Bridge is a twin-track railway overpass on the new Erfurt–Leipzig/Halle line. Designed as a frame bridge, the 576.5 m long structure spans the valley of the Scherkonde river east of Krautheim (some 15 km north of Weimar) at a height of up to 34 m.

Back

Project data

Year of completion
2010
Project duration
12 Months
Country
Germany
Address
Grossbrembacher Strasse 113
Postcode
99439
Town or city
Krautheim
Realization
Adam Hörnig Baugesellschaft GmbH & Co
Structure
Bridge
Type of structure
Cantilevered parapets

Cantilevered parapet

Construction method
Straight
Number of spans
14
Longest span
44 m
Number of piers
11
Length of bridge (superstructure)
576 m
Width of bridge (superstructure)
13.95 m
Height of bridge (up to top edge of superstructure)
33 m
Parapet height
1.10 m
Parapet width
0.45 m
Height of inner shield
0.49 m
Length of concreting section
26 m
Number of casting sections
23