The three-chambered slot-bin for supplying the power station with fuel was the biggest formwork-engineering challenge on this project. The cover-slab of this approx. 310 m long, 33 m wide and 23 m deep underground coal bunker was built using a custom solution based on the 'roller-drawer principle'.