The Danube bridge at Traismauer is part of the S33/S5 orbital trunk-road linking the A5 Brno–Vienna motorway with the A1 Vienna–Salzburg motorway. This 356 m long bridge across the River Danube was built with two pairs of Doka's newly developed Cantilever forming traveller (CFT).