The Massman Traylor Alberici JV is currently building a new 457 metre long cable-stayed bridge across the Mississippi between St. Louis, Missouri and the Metro East region of Illinois. The bridge has two lanes in both directions, with room to widen this to three if increased traffic volumes require.