This project was for a complete renovation of the Wolfsberg Tunnel on Austria's A10 'Tauernautobahn' transalpine motorway, involving a 211 m long cut-and-cover zone followed by a 428 m long underground tunnel. An all-hydraulic tunnel formwork traveller was fielded here, permitting extremely short repositioning times.