From the 4th floor upward, the Torminäe high-rise splits into a residential building and a hotel tower. Due to the adverse weather conditions the Protection screen Xclimb system was used at the slab edges, and Guided climbing formwork Xclimb 60 on the the outside walls, to give the crew the best possible protection from the wind and the weather.