Soaring to 160 m above Milan, the two high-rise towers of the administrative seat of the Lombardy regional government are the tallest buildings in Italy. The central structure core was raised with Doka automatic climbing formwork SKE50 and Top 50 large-area elements, in fast cycles of as little as 3 days. Dokamatic tables and the Table Lifting System TLS were in action for the CIP concrete floor slabs.