This 3100 m long 4-lane motorway bridge is being erected to link an offshore island to the mainland. Its pylon height of 320 m and clear span of 1104 m break two world records at once. Doka automatic climbing formwork SKE50 and SKE100 has been fielded to ensure that the pylon is completed in time .