China Gezhouba Group Corporation is the prime contractor responsible for the construction of Xiangjiaba Hydropower Station, which is located in the lower reaches of the Jinsha River. With a crest height of 384 m, the dam controls a basin spanning 458,800 square kilometres, accounting for 97% of the total area of the Jinsha River Basin. At present, the project is still in the construction phase. Primarily used the hydraulic Automatic climbing system SKE50 and the Large-area formwork Top 50.