calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Southern Ring Road

Thailand

When it came to building two pylons for the 941 m long Southern Bangkok Ring-Road Bridge, the Doka Formwork Experts had some tough challenges to master. Using Doka automatic climbing formwork SKE50 enabled the complex structure geometry, with its varying cross-sections and angles of inclination, to be tackled efficiently, swiftly and safely.

Back

Project data

Year of completion
2011
Project duration
30 Months
Country
Thailand
Town or city
Bangkok
Realization
Ch Karnchang Public Company Limited
Structure
Bridge
Type of structure
Piers and pylons

Pylon

Construction method
Inclined
Structure height
164 m
Height of casting sections
4 m
Cycle time
7 -day cycle